• Projets
  • News
  • Publications
  • Agence
  • Job
  • Contact
  • Instagram
  • Projets
  • News
  • Publications
  • Agence
  • Job
  • Contact
  • Instagram

Actualités

  • 2018.09.19 // SOIRÉE D’INAUGURATION DE L’AGENCE DND // 18 rue Beccaria, 75012 Paris
  • 2018.02.01 // NOUVELLE ADRESSE POUR L’AGENCE DND // 18 rue Beccaria, 75012 Paris Exemplaire
  • 2018.02.02 // Résidences du Lac – Bordeaux – © Benoit Bost
  • 2018.01.25 // CAP 360 – Presqu’île de Caen
  • 2018.05.01 // DND VOUS SOUHAITE UNE EXCELLENTE ANNEE 2018
DND architectes
  • Projets
  • News
  • Publications
  • Agence
  • Job
  • Contact
  • Instagram
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

RÉSIDENCE ÉTUDIANTE 2

Cliquez ici pour afficher informations du projet

RÉSIDENCE ÉTUDIANTE 2

RÉSIDENCE ÉTUDIANTE 2

164 CHAMBRES ET 200 PLACES DE STATIONNEMENT

SAINT-DENIS (93)

 

Ce projet s’inscrit dans un projet urbain global qui requalifie entièrement une ancienne friche industrielle localisée à la confluence de la Seine et du Canal Saint Denis. Le projet urbain se développe sur une emprise d’environ 4 ha.

Le projet architectural superpose164 chambres étudiant et un parking silo de 200 places.

Situé entre la Seine et le canal Saint Denis, ce site présente une situation exceptionnelle mais aussi des contraintes liées aux infrastructures qui le bordent et aux nuisances sonores qu’elles génèrent (trains TGV et RER, voitures sur le quai de Seine).

Le projet d’urbanisation s’appuie ainsi sur les forces existantes du site :

– en tissant un lien avec la Confluence à travers la mise en œuvre de percées visuelles sur  celles-ci depuis le sud du site ;

– en ouvrant des percées visuelles sur les voies d’eau;

– en aménageant la rive droite du Canal Saint-Denis.

Cette composition urbaine paysagère s’organise autour d’un vaste jardin public central et linéaire appelé le «jardin plissé».

Le projet joue de sa répétitivité et de sa masse par un travail de superposition et de stratification en façade: il apparaît comme une juxtaposition de plusieurs bâtiments et s’achève par un couronnement à toiture dans le respect et l’esprit de l’ensemble du projet.

 

Maîtres d’ouvrage groupe Quartus + Edelis //  Economiste Being  //  Bet structure Evp  //  Bet Cvc a2gc  //  Bet environnement Switch  //  Bet cfo cfa bader  //  Surface 3.530 m2 shab + parking 200 pl.  //  Coût travaux 8.5 m euros h.t.  //  Performances énergétiques : RT2005 H&E profil A // Etat d’avancement chantier en cours – livraison prévue en juin 2017

 CRÉDIT PHOTO : BENOIT BOST 

RÉSIDENCE ÉTUDIANTE 2

164 ROOMS AND 200 PARKING PLACES

SAINT-DENIS (93)

 

This plan is part of an overall urban project that completely redefines a former industrial brownfield site situated where the Seine and the Canal Saint-Denis converge. The urban project is developed on a site of about 4ha.

The architectural project includes 164 student rooms and a car park for 200 cars.

Positioned between the Seine and the Canal Saint-Denis, this site has an exceptional location; nevertheless, there are also some constraints linked to the surrounding infrastructure and noise they generate (TGV & RER trains, as well as cars on the Quai de Seine).

The urbanization project therefore uses the site’s existing strengths:

– By creating a connection with the convergence , allowing views of both the Seine and the Canal from the south of the site and building walkways;

– By opening views onto the waterways;

– By adapting the right bank of the Canal Saint-Denis.

The composition of the urban landscape is organized around a large central linear park called the « pleated garden ».

The main features of the project are its repetition of motifs and its mass, aspects of which have been created through the layering and stratification of the façade: it gives the impression of buildings juxtaposed with one another, with the roof as a crowning touch. This is all in keeping with the spirit of the project as a whole.

Refers to the convergence of the Seine and Canal Saint-Denis as in the later article. But they have capitalised Confluence. Maybe ask them if deliberate.

Developer groupe bremond + akerys  // Accountancy being // Technical office structure evp //tecnical office cvc a2gc //Technical office environment switch // Technical office cfo cfa bader // 3.530 m2 of living surface + parking 200 spaces //construction cost 9.8 m euros excluding tax // ongoing project

PHOTO CREDIT : BENOIT BOST 

RÉSIDENCE ÉTUDIANTE 2

164  VIVIENDAS Y 200 LUGARES DE APARCAMIENTO

SAINT-DENIS (93)

 

El proyecto forma parte de un plan urbano global que recalifica completamente un antiguo solar industrial localizado en la confluencia del Sena y el Canal Saint-Denis. El proyecto urbano se desarrolla en un área de aproximadamente 4 hectáreas.

El proyecto arquitectónico incluye 164 habitaciones para estudiantes y un aparcamiento de 200 plazas.

Ubicado entre el Sena y el Canal de Saint-Denis, el emplazamiento cuenta con una situación exceptional pero al mismo tiempo con algunas molestias asociados a las infraestructuras que la rodean y los ruidos que generan (trenes de alta velocidad y cercanías o coches por la orilla del Sena).

El proyecto de urbanización se apoya sobre los principales puntos fuertes del emplazamiento:

–  formando un enlace con la Confluencia (entre el Sena y Canal Saint-Denis) a través de la construcción de aperturas visuales sobre sí mismas desde el sur del emplazamiento.

–  construyendo aperturas visuales sobre las vías de agua

– acondicionando la orilla derecha del Canal Saint-Denis.

Esta composición urbana paisajística se organiza alrededor de un amplio jardín público central dispuesto en línea recta y llamado “el jardín plisado”.

El proyecto juega con la repetibilidad del conjunto mediante un trabajo de superposición y de estratificación de la fachada: aparece como una yuxtaposición de muchos edificios coronada por una cubierta que respeta el espíritu del conjunto del proyecto.

Cliente Investir immobilier Normandie  //  Oficina técnica Sero  //  Paisajista asociado Sempervirens  // Superficie 2.700 m2 de superficie  //  Coste 3.5 m euros impuestos no incluidos // Rendimiento energético : RT2005 BBC // Estado del proyecto: Obra en curso

CREDITO FOTOGRAFICO : BENOIT BOST 

1